Installing a Mobile Home: Step-by-Step Guide and Budget
By Matheus Agueda · 10 September 2026
Last updated: 31 October 2026

From delivery to habitation: the complete process
Installing a mobile home is simpler than building a house, but it is more than setting it down and plugging it in: the ground, the base, the levelling and the connections decide how the home performs over the years. Green Village delivers the home to your plot and sets it down on its supports; levelling and the connections are the owner's responsibility, carried out by local professionals the owner hires. This article sums up the steps and what to budget for.
For the full technical guide, see how to install a mobile home on land.
Want the delivered price for your plot?
Tell us the model and the location: we send a written quote with transport and delivery to your plot included.
Before you buy: the land and the permit
In Portugal, a mobile home that stays in place needs a licença or a comunicação prévia under the RJUE, depending on the zone and the municipal PDM; being movable does not exempt it. Ask the câmara for a written informação prévia before you buy the land. The guide to mobile home permits in Europe summarises the rules by country.
Step 1: Site preparation
Levelling and base
The mobile home sits on concrete blocks or adjustable supports, never directly on the ground: the gap between the chassis and the soil ventilates the underside and prevents rising damp. Preparation depends on the plot: on flat ground, compacting the soil and laying the blocks is usually enough; on a slope, earthworks or a platform may be needed. Levelling follows the unit manufacturer's instructions.
Skirting (underside cladding)
Optional. It closes the gap between the chassis and the ground, improves the look and protects against the cold, as long as it keeps ventilation openings. It can be PVC, treated timber or masonry.
Step 2: Access and delivery
Transport and delivery to your plot are included in the delivered price. Transport is organised by Mobile Home Logistic, the partner logistics company of the same group, insured at 100 % of the unit's value. Before you buy, send the location and photos of the access to the plot, showing the width of the track, the bends, the gradient and obstacles such as cables, walls or trees, so the delivery is planned with that information.
Step 3: Connections
The connections are made by certified professionals hired by the owner.
Water
- Mains: a connection request to the municipal water operator.
- Borehole: in Portugal, a water-use title from APA, the Portuguese Environment Agency, is required, through prior communication or authorisation depending on the extraction equipment.
Electricity
- Grid: a connection request to the distribution network and a contract with a retailer.
- Off-grid solar: panels, batteries and inverter sized by a certified installer; see sustainable mobile homes: solar and off-grid.
Sewage
- Public sewer: a connection to the municipal sewer.
- No sewer: a sealed septic tank or a licensed treatment system; ask the municipality what your plot requires.
Gas
- Butane or propane bottles, or an LPG tank for higher consumption; the gas installation is done by a certified technician.
What to budget for
The delivered price already includes transport and delivery to your plot, with VAT shown separately. Ask local contractors for a written quote for:
- site preparation, the base and the access;
- levelling;
- water, sewage and power up to the connection point, and the connections to the home;
- gas, if you use it;
- skirting and a deck or veranda (optional).
The amounts depend on the plot: on land without utilities, the borehole, the solar system and the septic tank weigh more than on a serviced plot.
5 common mistakes to avoid
- Not checking the land use and the access before buying — ask the câmara for the informação prévia and confirm the access to the plot.
- Skimping on levelling — a chassis out of level can distort the structure and stop doors and windows from closing properly.
- Forgetting underside ventilation — the space under the home must be ventilated to prevent condensation and chassis corrosion.
- Connecting gas without a certified technician.
- Leaving the connections unprotected — exposed water and sewage pipes can freeze in winter in northern and central Portugal.
Green Village sells the mobile home and delivers it to your plot, with transport included in the delivered price; levelling and the connections are the owner's responsibility. Contact us for information about the units. To compare prices, the mobile home prices page gathers the catalogue units with the price of each, and affordable mobile homes shows the lower-priced ones.